
Heat pump 2026
9 kW, 9 kW heat pump in Grodzisk Mazowiecki
Grodzisk Mazowiecki, grodziski county
Replacing a 2005 gas boiler: an air-to-water heat pump and a hot water tank.
An air-to-water heat pump heats the house and the water. We start by calculating the building’s heat loss, so the pump is neither too small for frost nor too big for the rest of the year.

Energy flow
Panels produce during the day, the house takes what it needs and the heat pump and air conditioning use the surplus. Less power goes back to the grid for pennies.
About 1,000 kWh from every kWp of panels a year on a south-facing roof.
Turns light into electricity. The inverter makes sure the house uses it first.
Solar PV for your homeUses power as it comes: fridge, washing machine, chargers. The surplus moves on instead of going to the grid for pennies.
Turns 1 kWh of electricity into 3-4 kWh of heat for underfloor heating and hot water.
In summer it cools exactly when the panels produce the most. In winter it can add heat.
Air conditioningProjects
The projects are samples (the company is fictional) and the photos show the type of installation, not a specific house.
All projects
Heat pump 2026
Grodzisk Mazowiecki, grodziski county
Replacing a 2005 gas boiler: an air-to-water heat pump and a hot water tank.

Solar PV + heat pump 2025
Legionowo, legionowski county

Process
Sizing takes the longest. The installation itself is 2-3 days.
Week 1
We calculate how much heat the house loses, check the radiators or underfloor heating and where the outdoor unit can stand.
Week 2
We size the pump and the hot water tank to your house, not to the biggest model in the catalogue.
Week 3
We prepare the paperwork, including proof that the old boiler is gone if the programme requires it.
Week 4
Base for the outdoor unit, plumbing and wiring. We remove and take away the old boiler.
Week 5
We set the heating curve and show you how to control the pump from your phone.
Questions
Often yes, but we start by calculating heat loss. With radiators we check whether they are enough at a lower water temperature. Sometimes it is better to insulate the loft first and then fit a smaller pump.
In houses around Masovia we mostly fit air-to-water pumps: they cost less and need no drilling. We suggest ground source for a large house on a plot where drilling is possible.
In a house of about 150 m², usually 3000-5000 kWh a year. That is why it pairs well with solar panels; the calculator on this page includes this consumption.
New units run quieter than normal conversation. We place them away from bedroom windows and the plot boundary, on a base that dampens vibration.
We remove it and take it away. If the grant programme requires proof of removal, we prepare the document.
Grants
Solar panels and heat pumps can currently be co-funded by grant programmes and a thermal retrofit tax relief. The rules and amounts change every few months, so we do not promise them here: at the audit we check what applies to you, and we fill in the application ourselves.
We will come over, calculate the heat loss and check the radiators. No fees and no commitment; we will call you back to book a date.
Rather talk? 500 000 000