Solar PV 2026
8.8 kWp, 8.8 kWp solar PV in Piaseczno
Piaseczno, piaseczyński county
Panels on a south-facing roof, inverter in the garage, installed in two days.
Under net-billing you gain most from power you use straight away. So at the audit we look at when your house uses electricity during the day, and only then choose the system size.

Energy flow
Panels produce during the day, the house takes what it needs and the heat pump and air conditioning use the surplus. Less power goes back to the grid for pennies.
About 1,000 kWh from every kWp of panels a year on a south-facing roof.
Turns light into electricity. The inverter makes sure the house uses it first.
Uses power as it comes: fridge, washing machine, chargers. The surplus moves on instead of going to the grid for pennies.
Turns 1 kWh of electricity into 3-4 kWh of heat for underfloor heating and hot water.
Heat pumpsIn summer it cools exactly when the panels produce the most. In winter it can add heat.
Air conditioningProjects
The projects are samples (the company is fictional) and the photos show the type of installation, not a specific house.
All projects
Solar PV 2026
Piaseczno, piaseczyński county
Panels on a south-facing roof, inverter in the garage, installed in two days.

Solar PV + heat pump 2025
Legionowo, legionowski county

Process
A typical timeline for a detached house.
Week 1
We measure the roof, check the fuse board and shading, and go through last year’s bills.
Week 2
You get the panel layout on a roof plan, a production estimate and one price for everything.
Week 3
We fill in the application and collect the attachments. You just sign.
Weeks 4-5
Panels usually take 1-2 days, a heat pump 2-3 days. We clean up after ourselves.
Week 6
We register the system with the grid operator and show you how to read the inverter app.
Questions
Yes, if you use most of the electricity straight away. Energy sent to the grid is worth less than energy you buy, so we size the system to your consumption, not with a big margin, and suggest which appliances to run when production peaks.
Panels on a detached house usually take 1-2 days. The whole process, from the audit to the grid connection, takes about 6 weeks.
Yes. Each panel produces less than on a south roof (the calculator uses 840 instead of 1,000 kWh per kWp a year), but production spreads over the morning and afternoon, when the house uses power anyway.
Not always. A battery makes sense if you use a lot of power in the evening or have a heat pump. At the audit we show both options with prices.
At the audit we check shade from the chimney, trees and nearby buildings at different times of day. Shaded panels get optimisers, or we leave that spot out.
Grants
Solar panels and heat pumps can currently be co-funded by grant programmes and a thermal retrofit tax relief. The rules and amounts change every few months, so we do not promise them here: at the audit we check what applies to you, and we fill in the application ourselves.
We will come over, measure the roof and check the wiring. No fees and no commitment; we will call you back to book a date.