Solar PV · 2024

6.8 kWp ground-mounted solar PV in Wiśniew

A sample project of a fictional company. The photo shows the type of installation, not this house.

Two even rows of solar panels on a ground frame in mown grass, an old red brick house and apple trees in the background
Illustrative photo

A red brick house from the 1960s whose roof needs replacing in a few years, so we did not want to load it.

The panels stand in two rows on a frame in the orchard, facing south and clear of the trees’ shade. The cable to the house runs underground in a protective conduit.

Grants

Let’s work out your house

Every roof is different: pitch, shading, the state of the tiles. At the free audit we measure everything on site and match the system to your bills, and we fill in the grant application for you.

Free on-site audit

We will come over, measure the roof and check the wiring. No fees and no commitment; we will call you back to book a date.

Halny Energia is the data controller. We will use your details only to book the audit and delete them after 7 days if no contract is signed. Privacy policy

This is a demo website: your request will not reach any company.

Rather talk? 500 000 000